Pakenham, VIC
Bridge Inn Road Level Crossing Removal
Solution for
Civil Infrastructure
Capability
Design & Construct
Year
2021
Client
Metro Trains Melbourne
Prefab1 was engaged by John Holland Group to deliver a tailored site shed compound for the Pakenham Level Crossing Removal Project. The scope involved the installation of over 35 custom-built sheds, designed specifically for John Holland and leased to them for the duration of the project.
All sheds were installed in under two days, with Prefab1 also managing the ongoing construction of covered walkways and service connections. The team provided a complete turnkey solution, overseeing every aspect from slab construction and ramp installation to decking and roof structures.
This project highlights Prefab1’s ability to deliver rapid, end-to-end compound solutions for major contractors—offering speed, customisation, and full-service project delivery from a single provider.